Seam Sewing Production Line and Quality Inspection Process for Flexible Intermediate Bulk Containers (FIBCs)

From raw material intake to finished product shipment, this process covers drawing, twisting, oiling, and inspection on both film-breaking and machine lines. It also details our company's batch sampling inspection protocol.
The company's sewing thread production begins with the receipt of polypropylene raw materials. Incoming batches are inspected for lot number, appearance, and moisture content; only qualified materials proceed to the drawing process. During drawing, temperature and draw ratio are precisely controlled to ensure uniform monofilament thickness, providing a stable foundation for subsequent twisting.
The twisting process sets twist and tension according to different specifications. Operators record equipment parameters each shift and perform visual inspection on the first piece. After yarn formation, it undergoes oiling treatment to improve smoothness during sewing and reduce thread breakage impacts on bag-making efficiency.
Quality inspection uses batch sampling to check wire diameter deviation, breaking strength, twist uniformity, and surface defects. Results are archived. If anomalies are detected, production for that batch is paused; equipment and raw materials are traced back to identify the root cause before resuming.
Finished goods are packed to specification and stored. Labels and quantities are verified before shipment. While we cannot guarantee zero defects, we continuously improve through process records and sampling data to catch issues before delivery.
